SolidLaunchpad
✨ New — phase gates, launch readiness & closed-loop 8D corrective actions

APQP & PPAP, alive

Your APQP is a living model, not a binder.

SolidLaunchpad connects process flow → PFMEA → control plan → the 18-element PPAP into one model that stays in sync — then runs the whole launch on it: phase gates, readiness, and 8D corrective actions that feed escapes back into the FMEA. The method checks itself; AI drafts your first PFMEA while you pour the coffee.

1-week free trial · No credit card · Cancel anytime

From the team behind SolidQMS — the all-in-one QHSE & ISO-compliance platform
PFMEA Suspension bracket · live Action Priority ✨ AI-drafted
Step
Failure mode
S
AP
Drill bore
Bore position out of tolerance
8
High
MIG weld
Insufficient weld penetration
9
High
Powder coat
Coating thickness too low
6
Medium
Saw stock
Length out of tolerance
4
Low
⚠ 1 method violation SC-02 not yet in the control plan
Aerospace · AS9145· Automotive · IATF 16949· CNC machining· Injection moulding· AIAG-VDA PFMEA

How it works

From a paragraph to a submittable PPAP.

Five steps take a brand-new part from a blank page to a customer-ready Production Part Approval Process — without rebuilding four disconnected documents by hand.

  1. 01

    Describe the part

    Write a paragraph about the part and how it's made — or create the program by hand. No template hunting.

  2. 02

    AI drafts the core

    In ~20 seconds you get a typed process flow, an AIAG-VDA PFMEA with S/O/D and rationale, and a starter control plan.

  3. 03

    Review & refine

    Every AI row is flagged ✨ until you accept it. Edit inline, drag failure modes on the risk matrix, add controls.

  4. 04

    The method checks itself

    A consistency engine runs the hard AIAG/VDA rules and flags gaps — unscored rows, missing detection, orphaned special characteristics.

  5. 05

    Build the PPAP & submit

    Work the 18-element board. Engineering elements link to your live artifacts; the PSW lights up when everything applicable is complete.

The basics

What APQP and PPAP actually are.

If you supply parts into automotive or aerospace, these two acronyms govern how you launch a product. Here's the plain-language version — and how SolidLaunchpad makes each one a living thing instead of a folder of files.

APQP — Advanced Product Quality Planning

A structured framework that takes a new part from concept to capable production in five phases, so quality is planned in rather than inspected later. Each phase produces the inputs the next one needs.

  1. 1
    Plan & define the program
    Translate the voice of the customer, targets and special characteristics into a quality plan before any metal is cut.
  2. 2
    Product design & development
    Design FMEA, design verification and the early drawings — the inputs your process has to deliver.
  3. 3
    Process design & development
    Process flow, PFMEA and control plan: how the part will actually be made, and how every risk is controlled.
  4. 4
    Product & process validation
    Trial runs, MSA, initial process studies (Cpk) and the PPAP submission that proves the process is capable.
  5. 5
    Launch, feedback & corrective action
    Ramp to volume, monitor with the control plan, and feed escapes back into the PFMEA. The model keeps living.

PPAP — Production Part Approval Process

The standardized evidence pack a supplier submits to prove it can make the part to specification at volume. It bundles 18 elements; the engineering ones — Process Flow, PFMEA and Control Plan — are exactly the artifacts you build in phase 3.

The five submission levels
  • 1
    PSW only — Part Submission Warrant submitted to the customer.
  • 2
    PSW + samples + limited data — Warrant with product samples and limited supporting evidence.
  • 3
    PSW + samples + complete data — The default for most automotive parts — full supporting documentation.
  • 4
    PSW + customer-defined — Whatever the customer specifically requires.
  • 5
    PSW + samples + full data, on site — Complete records reviewed at the supplier's manufacturing location.

01

✨ Describe it. Get a PFMEA.

Tell the AI about your part and process in plain language — it drafts a typed process flow, a method-correct PFMEA with S/O/D and rationale, and a starter control plan in about 20 seconds. Every draft lands as editable rows, clearly flagged ✨ until you accept them. You review; the AI does the legwork.

"Machined aluminium bracket: saw, mill, drill & ream Ø12 bore, deburr, MIG weld, powder coat; the bore position is critical."
✨ Draft my program ~20 seconds
Drill & ream Ø12 boreoperation
Bore position out of tolerance · S8
Control: CMM first-off + SPC

02

One linked, living model.

Process flow, PFMEA and control plan share the same process steps and special characteristics. Change a step and everything stays in sync. The PPAP's elements 5, 6 and 7 are not re-uploads — they're live links to these very artifacts.

Process
flow
PFMEA
Control
plan
PPAP
5·6·7

Shared process steps & special characteristics — change once, synced everywhere.

03

The method guards itself.

A consistency engine runs the hard AIAG/VDA rules continuously: a severity-9 failure mode without a detection control, an unscored row, a special characteristic that hasn't propagated into both the PFMEA and the control plan — surfaced as a quiet wayfinder, never a blocker.

Severity 9 on "Insufficient weld penetration" requires a detection control.
SC-02 must appear in both the PFMEA and the control plan.
CC-01 propagated: defined · in PFMEA · in control plan.

04

The 18-element PPAP, live.

The full Production Part Approval Process as a board: applicability, owner and status per element, with the engineering elements wired to your live artifacts. The PSW button stays dim until every applicable element is complete — then it lights up.

5 · Process flow Complete
6 · PFMEA Complete
7 · Control plan Complete
8 · MSA In progress
9 · Dimensional Pending
18 · PSW Pending
Generate PSW — 3 elements to go

The full lifecycle

It doesn't stop at the PPAP.

A binder ends the day it's submitted. A living model keeps running the program — every phase deliverable tracked, every phase gate signed, readiness proven, and real-world escapes turned into corrective actions that flow right back into the FMEA.

Deliverables & a gate sign-off on every phase
  1. 1
    Plan & Define
  2. 2
    Product Design
  3. 3
    Process Design
  4. 4
    Validation
  5. 5
    Launch & Feedback

The loop closes here. Escapes at launch become 8D corrective actions — and feed straight back into the PFMEA, so the model keeps living and the next program starts smarter.

Phase deliverables

Every APQP phase carries its deliverables — owner, due date and status — auto-checked against your live artifacts.

Phase gates

Sign off each phase gate — approved, or approved with actions — with a name and a timestamp. A clean record of who released what, when.

Self-assessment checklists

Work the APQP-readiness checklists per program; every gap you flag can be promoted straight into a corrective action.

Team feasibility commitment

The signed Appendix-D feasibility review — can we actually make this part? — captured, signed and printable.

Launch readiness

One computed go / no-go: nine checks across the whole program turn green only when it's genuinely ready to launch.

8D corrective actions

Promote a high-risk FMEA cause or a failed check into a full 8D CAPA — an org-wide inbox tracks every action through to closed.

The method, in depth

PFMEA, control plan and special characteristics — done right.

SolidLaunchpad isn't a generic form builder. It implements the AIAG-VDA method end to end, so the analysis you produce is the analysis your customer and auditor expect.

AIAG-VDA PFMEA with live Action Priority

Score Severity, Occurrence and Detection on the 1–10 scales and the Action Priority (High / Medium / Low) is looked up from the official AIAG-VDA table as you type — no RPN arithmetic, Severity weighted first. A colour-coded Severity × Occurrence risk matrix plots every failure mode, and you can drag a dot to re-score it.

Control plan that inherits the risk

Each control-plan line ties back to a process step and a characteristic — specification, evaluation method, sample size and frequency, control method and reaction plan. Because it shares the process flow, the high-risk steps from your PFMEA are exactly the ones the control plan has to cover.

Special characteristics that propagate

Flag a characteristic as critical or significant once, and SolidLaunchpad tracks it from the PFMEA into the control plan. If a special characteristic isn't controlled everywhere it should be, the method check tells you — before the customer does.

The full 18-element PPAP

Every submission tracks all 18 AIAG elements with applicability, owner and status. Elements 5, 6 and 7 are live links to your process flow, PFMEA and control plan — so they're never out of date.

1 Design Records
2 Engineering Change Documents
3 Customer Engineering Approval
4 Design FMEA (DFMEA)
5 Process Flow Diagram
6 Process FMEA (PFMEA)
7 Control Plan
8 Measurement System Analysis (MSA)
9 Dimensional Results
10 Material & Performance Test Results
11 Initial Process Studies (SPC / Cpk)
12 Qualified Laboratory Documentation
13 Appearance Approval Report (AAR)
14 Sample Production Parts
15 Master Sample
16 Checking Aids
17 Customer-Specific Requirements
18 Part Submission Warrant (PSW)

Use cases

Who uses SolidLaunchpad.

From a single quality engineer drafting a first PFMEA to a plant running dozens of program launches — anywhere APQP and PPAP are part of the job.

🏭

Tier-1 & Tier-2 automotive suppliers

Preparing PPAP packages for OEM and Tier-1 customers under IATF 16949 — machined, moulded, stamped, cast, welded or assembled parts.

✈️

Aerospace suppliers (AS9145)

Run APQP and the FAI/PPAP flow for aerospace programs with the same connected model and AIAG-VDA-style risk analysis.

🧑‍🔧

Quality & APQP engineers

Stop reconciling a process-flow spreadsheet, a PFMEA workbook and a control-plan template by hand. One model, always in sync.

🚀

New program launches

Take a new part from kickoff to a submittable PPAP — fast — without starting every document from a blank page.

🔁

Engineering changes & re-PPAP

Revise the affected steps, let the change ripple through PFMEA and control plan, and re-submit a clean warrant.

Audit & customer readiness

Share a live, consistent package with your customer SQE and your IATF auditor — free viewer seats, no exported stale PDFs.

Why it's different

A living model beats a binder.

The traditional APQP package is four documents in four files that quietly drift apart. SolidLaunchpad keeps them as one connected model — here's what that buys you.

One source of truth

Process flow, PFMEA, control plan and PPAP share the same steps and special characteristics. No copy-paste, no version drift between four documents.

Self-checking method

Hard AIAG/VDA rules run continuously, so a severity-9 mode without detection or an un-propagated special characteristic never slips through to the auditor.

Faster, not sloppier

AI removes the blank-page tax on the first PFMEA and control plan; you spend your time on engineering judgement, not formatting.

Always audit-ready

Because the PPAP's engineering elements are live links — not re-uploads — your submission reflects today's reality, not last quarter's.

Glossary

APQP & PPAP terms, defined.

The acronyms you'll meet across a launch — in one place.

APQP
Advanced Product Quality Planning — the five-phase framework for taking a new part from concept to capable production.
PPAP
Production Part Approval Process — the standardized 18-element evidence pack that proves a supplier can make the part to requirements at volume.
PFMEA
Process Failure Mode and Effects Analysis — the AIAG-VDA risk analysis of each process step, scored on Severity, Occurrence and Detection.
DFMEA
Design FMEA — the same risk analysis applied to the product design rather than the manufacturing process.
Control plan
The document that defines how each special and key characteristic is measured and controlled in production, with reaction plans.
Special characteristic
A product or process characteristic (critical or significant) that needs extra control because it affects safety, fit, function or compliance.
Action Priority (AP)
The AIAG-VDA replacement for RPN — a High / Medium / Low priority looked up from the combination of Severity, Occurrence and Detection.
S / O / D
Severity, Occurrence and Detection — each rated 1–10; the three inputs that drive Action Priority in a PFMEA.
PSW
Part Submission Warrant — element 18, the cover sheet the supplier signs to certify the PPAP submission.
MSA
Measurement System Analysis — studies (e.g. Gage R&R) that prove your measurement system is capable of trusting the data.
IATF 16949
The automotive quality management system standard that requires APQP, PPAP and AIAG-VDA FMEA from suppliers.
AS9145
The aerospace standard defining APQP and the Production Part Approval Process for the aviation, space and defense supply chain.

Pricing

Simple, per-editor pricing.

Viewers are always free — a PPAP is made to be shared, with your customer and your auditor.

Starter
Free for 1 week

Everything in Pro, free for a week — then €49/editor/mo to keep going.

  • 1-week trial of everything
  • All programs, PFMEA, control plan & PPAP
  • AI drafting included
  • Unlimited free viewers
Start your free week
Most popular
Pro
€49 / editor / mo

The full living APQP, for your whole quality team.

  • Unlimited programs
  • AI drafting (PFMEA & control plan)
  • Self-checking AIAG-VDA method
  • Live risk matrix & Action Priority
  • 18-element PPAP board & PSW
  • Unlimited free viewers
Start free
Enterprise
Custom

For regulated, audited supply chains.

  • Everything in Pro
  • Single sign-on (SSO)
  • Onboarding on your methodology
  • Audit trail & SLA
Talk to us

Prices exclude VAT. Annual billing saves ~2 months. Viewers are always free; cancel anytime.

From a paragraph to a submittable PPAP. Start your first program today.

Sign up with email or Google · two minutes to your first PFMEA

Also from SolidQMS B.V.

SolidBowtie

See every barrier between hazard and harm.

SolidLaunchpad plans quality in. Our sister app keeps operational risk out — the bowtie method, made living: barriers with real owners and health, assurance tasks that flag when they're overdue, incidents that feed back into the model, and an AI that drafts your first bowtie.

  • Barrier health that degrades the moment a proof test slips
  • AI-drafted bowties in ~20 seconds — you review, it does the legwork
  • Incident feedback & weakest-barrier analytics